Master in Mines with Mention in Mining Planning
hybrid
$ 6500.00
Master in Mines with mention in Mining Planning
2 Semesters
09/2024 al 09/2025
RPC-SO-39-No.628-2022
2
4091000 - Ext. 735 - 731
The Master in Mines, with a mention in Mining Planning, aims to train professionals who, based on the knowledge acquired in processes, methodologies and skills, can determine the feasibility of mining operations in an environmentally and socially sustainable manner.
It is expected that graduates of this program will be able to take advantage of the opportunities that arise in the national market, within technical planning, supervision and management positions, with leadership, creativity and optimization skills; in addition to promoting problem solving, through technological development with a strong social and environmental commitment.
Leonardo Nunez Rodas
Phone: 0998806147
Innovative professionals, capable of developing strategies and leadership skills for conflict resolution and optimization of the use of non-renewable resources, based on environmental, social and ethical responsibility.
Professionals with skills and tools to design, plan, and execute plans for the development of mining processes in the small, medium, and long term, through modeling, monitoring, and evaluation of mining components until the mine is closed.
MODULE | CONTENT |
---|---|
ANALYSIS OF MINING PROCESSES | * Planning and control models and techniques. * Technical programming formulas and management functions. * Development of a model for transportation in underground mining. * Development of a model for transportation in open pit mining. * Open pit mine design systems. * Underground mine design systems. * Process control in mineral processing. * Mine tailings, mining waste and waste dumps. |
ADMINISTRATION, MANAGEMENT AND MINING BUSINESS | * Project management. * Analysis of the economic importance of mining reserves. * Preparation of investment schedules and progress in the different mining tasks. * Network and multiplexing diagnosis. * Analysis of network diagrams. |
SOFTWARE APPLIED TO THE EXPLOITATION OF MINES | * Ramp design. * Control of laws underground. * Exploration and evaluation of resources. * Block model data analysis. * Production reports. |
FORMULATION AND EVALUATION OF MINING PROJECTS | * Geological modeling systems. * Economically produced software. * Management phases – evaluation of the mining project. * Technical, economic and financial processes aimed at evaluation. |
SUSTAINABILITY AND MINING ENVIRONMENTAL ASSESSMENT | * Sustainable development. * Methodologies aimed at identifying and evaluating environmental impacts. * Evaluation of environmental impacts and environmental management plan. * Economic and social assessment of the environment. * Monitoring and inspection. * Management of contaminated soils in mining closure plans. * Acid drainage treatment techniques. * Reuse of sites and facilities. |
DEGREE WORK | * Includes temporary, progressive and final closure scenarios. * Scientific investigation. * Design of the investigation. * Information development. * Presentation of the report. |
DESIGN AND OPTIMIZATION OF MINING EXPLOITATION | * Geological parameters with direct technical-economic impact. * Resource estimation. * Introduction to open pit mine design. * Production program. * Mine planning. * Management of mining software. * Design of galleries and ramps. * Evaluation of technical parameters for underground exploitation. * Mining cycle in underground mining and basic elements of safety management systems. * Design of underground mines. * Planning concepts. * Economic valuation of mineralized blocks. * Strategic planning: analysis of cut-off grades and production rates. * Drilling and blasting planning in underground mining. * Management of mining software. |
RISK MANAGEMENT AND MINING SAFETY | * Introduction to occupational hygiene in the mining field. * Physical, chemical and biological agents. * Evaluation and control of occupational risks. * International technical standards. * Industrial hygiene. * Occupational health in mining. * Mining safety risk management. * Security in management in the handling and reception of supplies. |
MINE CLOSURE AND REMEDIATION PLAN | * Place exposed pit walls to ensure physical stability. * Implementation of coverage techniques for revegetation. * Reconfiguration of the land. * Coverage analysis to reduce erosion and water infiltration. * Environmental guarantee strategies for the implementation cost calculated for the final closure and post-closure. |
MINING PLANNING | * Design of the mining process. * Production programs. * Cost and valuation. * Sustainable development indicators. |
MINERALURGICAL PROCESSES AND TREATMENT PLANTS | * Incorporation of environmental aspects in the management of metallurgical operations. * Analysis of progressive size reduction equipment (crushers and mills), physical or physicochemical separation equipment (flotation cells and hydraulic screens). * Classification of effluent recovery and conditioning equipment (thickeners, filters, ponds). |
The program is aimed at third-level degree professionals with a degree registered in the SENESCYT, in the areas of Mining Engineering, Geology, Geotechnics, Metallurgy, and other careers related to earth sciences.
Applicants must register on the Postgraduate Department website: www.posgrados.uazuay.edu.ec They must upload: passport-sized photo, third-level degree, identity card and updated CV.
Registration (50 USD) must be paid through the payment button with any credit card, or at the university treasury, or by deposit or bank transfer to the following accounts:
Pichincha Bank:
Current account No. 3186821004 - RUC: 0190131777001
Guayaquil Bank:
Current account No. 6447600 - RUC: 0190131777001
Produbanco:
Current account No. 02070000472 - RUC: 0190131777001
In case of deposit or bank transfer, once payment has been made, a copy of the receipt must be sent to transfers@uazuay.edu.ec and posgrados@uazuay.edu.ec indicating your personal data (ID number, full name, address and telephone number) and the program to which you are applying, for registration in the system.
SCHEDULE
REGISTRATION: Until Sunday, August 11, 2024
START OF CLASSES: September 2024
Teacher | Contact |
---|---|
Andrade Haro Byron Robespierre | |
Auquilla Teran Carlos Federico | cauquill@uazuay.edu.ec |
Feijoo Calle Ernesto Patricio | pfeijoo1969@gmail.com |
Jelvez Montenegro Enrique Boris | |
Luna Mendez Eduardo Andres | eduardolunamen@gmail.com |
Manriquez Leon Fabian Alejandro | fabianing@gmail.com |
Martinez Flores Jorge Ernesto | jorge.ernesto@hotmail.com |
Nuñez Rhodes Leonardo Anibal | otconsul@hotmail.es |
Ocampo Torres Karen Marcela | lkmocampo.minas@gmail.com |
Restrepo Baena Oscar Jaime | ojrestre@unal.edu.com |
Valencia Guaricela Fernando Tulio | fvalencia@uazuay.edu.ec |